We performed detailed sight line analysis to optimise the spectator experience and ensure minimal seat loss. This, alongside work with an expert track installer, allowed the team to deliver a complex set of high start ramps and jumps.
Additional temporary seating and event overlay allows the venue to grow for major competitions and events.